Duration of the Project completion : 36month
Scope of work : Structural Fabrication & Erection (15864mt) Anode Baking Furnace 4210mt Cast House Package 3600mtPipe Rack 1679mt Anode Assembly Storage 1270mt Anode Handling Storage 925mt Stem Bracket Repair shop 390mt Anode Roding Shop 2690mt Carbon Recycling Shop 1100mt